Search Results

Author: Davide Besenzon

Dam B1 was approximately 85 m high and 700 m long along the crown when it suddenly failed in 25th of January, after 41 years of operations and deposition of tailings at the Paraopeba mining complex (Côrrego de Feijão), in Minas Gerais, Brazil. More than 250 people died and vast economic, social and environmental damages resulted fro...

View Article

According to previously available research and seismic microzonation studies a large area of the Guayaquil (Ecuador, South America) sits on estuarine deltaic deposits which consist of weak and highly compressible clays with diatoms. The nature of these finegrained deposits may determine difficulties in a proper estimation of the soil properties. In this...

View Article
1