The Breach Problems in the Tunnels of the Boston Central Artery/Tunnel Project (Big Dig)

Abstract

The Boston Central Artery/Tunnel (CAT) project consists of some 200 lane-kilometers of bridges, tunnels, and surface roadways. The central part of the project involves constructing two directions of multi-lane roadway to depths exceeding 30 m beneath the existing city by means of the slurry wall technique. The resulting walls, called Soldier Pile Tremmie Concrete (SPTC) walls, held back the in situ soils, supported an existing elevated roadway during construction, and form the final walls of the new tunnels. In September 2004 a breach occurred in one panel in the deepest section of the tunnel, spewing water onto the roadway and creating a crisis of public confidence in the project. Investigation revealed that the breach resulted from a series of shortcomings in construction and inspection, for which the relevant parties took responsibility. Three alternate repair schemes were proposed. Selecting the best procedure involved not only technical considerations but also impacts on neighboring high-rise buildings. The incident has implications for the construction of deep slurry walls in congested areas.

Keywords: Slurry walls, Tunnels, Construction, Dewatering,


Submitted on September 14, 2006.
Final Acceptance on June 15, 2007.
Discussion open until April 30, 2008.
DOI: 10.28927/sr.303163